For the work party on Wednesday 22nd April there was only me and Eric initially so we decided to have look around the woodland and make a list of jobs to be done.
As we wandered around we had time to see what was growing and alongside the valley path, near post 10, we found these lovely bluebells still in bloom.
We carried on up this path to the section we had worked on last time ...
... and met up with Peter who had been delayed. There was still work to be done here repairing the path edges so we got on with that.
It was mainly cutting some poles to the required length and fixing them in place with two pegs.
Then levelling the pegs so that they weren't a trip hazard.
When we had finished the path edge was much stronger and hopefully will last a while.







No comments:
Post a Comment