For today's work party on Sunday Oct 11th we worked over on the far side near the bridge clearing vegetation and repairing steps.
The shortest way to the bridge is up the pylon field. It's quite steep to begin with but levels off past the pylon.
Both sides of the bridge need attention ...
... this is up the path towards post 6 looking back down towards the bridge.
Imogen and Zach have started the repair work, laying new poles to form the steps.
On the other side of the bridge Cathy, Aiden, Peter and Andy are clearing the sides of the path and starting to open up the drainage ditches at the sides.
By the end of the work party the new steps were in place on the P6 hill ...
... and on the post 5 side. You can see here where the ditches have been improved looking down towards the bridge.
And here looking back up the hill from the bridge.
The volunteers put in a lot of hard work today and made a great improvement to the paths leading to and from the bridge.